Support for electrical planning of wind farm and pumped storage power plant Client: Max Bögl Wind AG […]

Read More…

Design, specification and support during construction Client: BWP Reußenköge GmbH […]

Read More…

Design, specification and support during construction Client: Landwind GmbH […]

Read More…

The objective of this study was to identify the technically and economically best grid connection point for the wind farm Alpirsbach. By identifying a technically feasible grid connection point, grid connection costs could be reduced by around 700k €. Client: ENERCON IPP Deutschland GmbH […]

Read More…